Resources
Buying from a distant supplier means deciding in advance what to check, when and against which yardstick. Here you find how the checks on the company, the factory audit, sampling and the inspections from production to arrival work, and which rules of the Union turn these checks into a duty.
Pick a check to see what it concentrates on, when it takes place, who does it and what it gives back.
Main object Touched in part When it happens
When it happens With the lot finished, before it leaves the factory
Who does it An inspection company or an inspector of the buyer
What it gives A report with a pass or fail result
Which checks are made, and how often, depends on the product, the supplier and the contract. The moments shown are those described by inspection companies and change from one to another.
It checks the goods: finished pieces looked at by eye and in use, on a sample of the lot. It says what that lot is like.
It measures what the eye does not see: chemical and safety compliance. It says whether the product meets a requirement.
It looks at how the supplier operates, not at what it has produced. It says what the factory is like on the day of the visit.
It states that an external body has verified a management system against a standard. ISO writes the standards and does not issue certificates.
Some countries of destination require it as a customs document issued before shipment, among them Saudi Arabia, Morocco, Kuwait, Iraq, Uganda and Tanzania.
An inspection does not open every carton: it draws a sample and judges the lot from it. The rules are those of ISO 2859-1, whose third edition was published on 22 January 2026 and replaces the one of 1999. The inspection companies work with the tables of ANSI/ASQ Z1.4, which one of them describes as its American equivalent.
It is the set of pieces presented for inspection together. Its size is the first figure that goes into the tables.
There are three general levels, I, II and III, and four special ones, from S1 to S4. Level II is the usual one; level I gives the smallest sample and level III a larger one.
Lot size and inspection level give a code letter, and the letter gives the number of pieces to draw. A lot of 4,000 pieces at level II gives the letter L and a sample of 200.
The ISO catalogue describes it as the maximum average percentage of defective items considered acceptable during random sampling. One is set for each class of defect.
For each AQL the table gives the number of defects up to which the lot passes. With the sample of 200 of the example, at AQL 2.5 the lot is accepted with up to 10 defects and rejected from 11; at AQL 4.0 it is accepted with up to 14.
Critical: the product is unsafe or does not comply with the rules. Major: a defect in function or a large visible flaw. Minor: a cosmetic defect.
Inspection companies describe as common for consumer goods 0 for critical defects, 2.5 for major and 4.0 for minor, and tighter values for goods of high value. They are not a rule of the standard: the contract sets them.
The standard provides for switching between normal, tightened and reduced inspection. The 2026 edition also adds skip-lot procedures.
Before the first order the buyer checks that the supplier exists and is what it says it is: registration of the company, a copy of its business licence, creditworthiness, any licence required for that product. For a Chinese supplier the guidelines of the EU SME Centre name the copy of the business licence, the unified social credit code and the official register of enterprises.
Worth knowing. The European Commission's guide to importing goods lists among the first steps the creditworthiness of the supplier, import licences and restrictions, and a written contract. Sanctions are a separate check: the Union keeps a public consolidated list of the persons and entities under financial sanctions.
When it happens Before the first order
Who does it The buyer, on public registers and credit reports
What it gives Confirmation of who the counterpart is and whether it can trade
It is a visit to the factory to see how the supplier works, not what it produced in one lot. A quality system audit looks at organisation, processes, controls and records; a social audit looks at working conditions; others look at the environment or at the security of the supply chain. It is carried out by the buyer or by a third company.
Worth knowing. An audit describes the factory on the day of the visit and on the points checked. A management system certificate is something else: ISO writes the standards but does not certify and issues no certificates. External certification bodies do, and the accreditation of those bodies is not mandatory.
When it happens Before the order, then at intervals
Who does it The buyer or an audit company
What it gives An audit report with the non-conformities found
Before series production buyer and supplier fix the reference against which the goods will be compared: an approved sample, together with the specifications and the packing agreed. In inspection practice it goes by the names of reference sample, approval sample or golden sample, and it is what the inspector holds next to the pieces taken from the lot.
Worth knowing. In the automotive industry this step has a codified form: the production part approval process (PPAP), which AIAG describes as the industry standard. Its submission levels go from the part submission warrant alone (level 1) to the warrant with complete supporting data (level 3). The control plan sets the requirements for customer and supplier for the whole life of the project.
When it happens Before series production
Who does it Buyer and supplier together
What it gives An approved sample to compare the goods with
It takes place before production begins or when at most 20 per cent of it has been completed, in the definition of one of the large inspection companies. The inspector checks raw materials, components and the first pieces against the specifications and the approved sample, and sees whether the supplier has understood what it has to make.
Worth knowing. It finds problems at the point where the lot does not yet exist: a wrong material or a specification read badly show up before the whole order is made. For the same reason it says nothing about the quality of the finished lot.
When it happens Before production or within the first 20 per cent
Who does it An inspector of the buyer or of a third company
What it gives A report on materials, components and first pieces
It takes place once production is under way and part of the lot is finished. The threshold changes with the inspection company: one places it from the moment 20 per cent has been produced, another between 40 and 60 per cent. The inspector checks the finished pieces available, watches the line and compares progress with the delivery plan.
Worth knowing. It shows whether the defects found at the start have been corrected and whether new ones appear, while the rest of the lot is still to be made. Its English abbreviation is DUPRO, from during production.
When it happens With production under way and part of the lot finished
What it gives A report on the finished pieces and on progress
It is the check on the finished lot before it leaves the factory. The inspector draws a random sample according to the sampling tables, checks the pieces by eye and in use, counts the defects by class and verifies quantity, markings and packing. The result is a pass or a fail against the quality levels agreed between buyer and supplier.
Worth knowing. The moment is a convention that changes with the inspection company: Bureau Veritas asks for the shipment 100 per cent finished and at least 80 per cent packed, another company for 80 per cent of the order completed, a third for everything finished and packed. The preshipment inspection imposed by the government of the country of destination is a different thing, covered by a WTO agreement.
It takes place at the supplier's site while the container is being loaded. The inspector checks quantities, labelling and packing of the packages and supervises the loading. It does not replace the pre-shipment inspection: it looks at what is loaded and how, not at the quality of the pieces.
Worth knowing. What it checks is what the packing list describes: number of packages, markings and contents. The report says whether what went into the container matches it. It is the check closest to departure and the last one made at the supplier's.
When it happens While the container is being loaded
Who does it An inspector at the supplier's site
What it gives A report on quantities, packages and loading
It is the check the buyer makes when the goods reach its own warehouse. Inspection companies describe incoming quality control as the checking of raw materials, parts and components on arrival. It can use the same sampling tables as the pre-shipment inspection, with one difference: by now the goods have already travelled.
Worth knowing. When it finds a defect, the complaint to the supplier normally takes the form of a corrective action request. The 8D method, eight disciplines numbered from D0 to D8, is a problem solving model that starts from the root cause and arrives at a permanent corrective action.
When it happens When the goods reach the warehouse
Who does it The buyer
What it gives Acceptance of the lot or a complaint to the supplier
A supplier's presentation often lists standards and schemes. Each one covers something precise, and several changed edition in 2026.
1 ISO 9001 The quality management system standard. The 2026 edition was published on 16 September 2026: certificates to the 2015 edition must move to it by 30 September 2029, and from 31 March 2028 new accredited certificates are issued only to the 2026 edition.
2 Accreditation It is the formal recognition, by an accreditation body, of the body that issues the certificate. It is not mandatory, so certificates of non-accredited bodies exist.
3 Checking a certificate ISO points to IAF CertSearch, which lists accredited certificates only. IAF ceased operations on 1 January 2026 and Global ACI took over its role.
4 ISO 14001 The environmental management system standard. Its fourth edition was published on 15 April 2026.
5 IATF 16949 It defines the quality management system requirements for organisations that manufacture automotive products. The edition in use is that of 2016, which replaced ISO/TS 16949 of 2009.
6 SMETA The social audit of Sedex. With two pillars it covers labour standards and health and safety; with four it adds the environment and business ethics. The current version is SMETA 7.
7 SA8000 A social certification programme of Social Accountability International, now available in its 2026 edition. Only the certificates of bodies validated by SAAS are recognised.
8 CTPAT and AEO They concern the security of the supply chain. CTPAT is a voluntary programme of United States customs with minimum security criteria. In the Union the authorised economic operator has two forms: AEOC for customs simplifications and AEOS for security and safety.
9 Inspection required by a government The WTO Agreement on Preshipment Inspection covers the inspections contracted or mandated by the government of the importing country: quality, quantity, price and customs classification of the goods.
Some rules of the Union ask the company that buys to know its supply chain and to be able to prove it. Dates and thresholds are those in force in November 2026, after the changes of the last two years.
Due diligence directive (CSDDD), Union companies After Directive (EU) 2026/470: at least 5,000 employees and 1.5 billion euro of net worldwide turnover. Transposition by 26 July 2028, application from 26 July 2029.
The same directive, companies of third countries 1.5 billion euro of turnover in the Union. Reporting for the financial years starting from 1 January 2030.
Forced Labour Regulation, (EU) 2024/3015 It applies from 14 December 2027.
Deforestation Regulation (EUDR), (EU) 2023/1115 30 December 2026 for large and medium operators, 30 June 2027 for micro and small ones, 30 December 2027 for the products added by the delegated act of 17 September 2026.
Conflict Minerals Regulation, (EU) 2017/821 Tin, tantalum, tungsten and gold. It binds the importers of the Union and has applied since 1 January 2021.
A check measures the goods against something written. These are the documents in which buyer and supplier write it.
1 Written contract The Commission's guide for importers lists it among the first steps, next to the check on the supplier's creditworthiness and on import licences.
2 Specifications and approved sample They say what the product must be like. Every later check compares the pieces with these two things.
3 Quality levels and inspection plan Inspection level, AQL for each class of defect, which checks are made, when and by whom. Without these figures an inspection report has no pass or fail.
4 Quality agreement In the pharmaceutical sector the United States authority defines it as a comprehensive written agreement between the parties that defines and establishes the manufacturing activities of each. Other sectors use the same name for the same kind of document.
5 Control plan In the automotive core tools of AIAG it is a consistent set of requirements for customers and suppliers throughout the life of the project.
6 Corrective action and 8D When a defect is found, the buyer asks the supplier for a corrective action. The 8D report documents it in eight disciplines, from D0 to D8, from the root cause to the permanent correction.
This page explains how each check works. Which ones your suppliers need depends on the product, the country and the volumes: if you would like an opinion, write to me.
The checks on the supplier tie in with the rest of the purchase: the importer's obligations say what the buyer answers for, the shipping documents carry the certificates, and the payment method decides when the money leaves in relation to the inspection.
Importer obligations ›Shipping documents ›International payments ›Total cost of an import ›
This page describes standards and rules of the European Union as they stand in November 2026 and summarises a market practice that changes from sector to sector. It is a summary for information only: it does not replace the text of the ISO standards, of the regulations or of the contracts, and it is not legal advice. Sources: ISO, Certification; ISO/TC 176, ISO 9001 news; ISO, ISO 2859-1:2026; QIMA, Acceptable quality limit; WTO, Agreement on Preshipment Inspection; Sedex, SMETA audit; SAI, SA8000; AIAG, PPAP; European Commission, CSDDD; European Commission, Guide to import goods. Updated in November 2026.
A guide to print: the eight checks from the company to the arrival of the goods, sampling with a worked example, audits and certificates, the rules of the Union with their dates and the tools of the contract. You get it by subscribing to my newsletter, which comes out twice a year with news on customs, transport and international purchasing.
Home Services Portfolio About Contact