Most goods that cross an ocean do so in a container. Here you find which containers exist and what each one holds, the difference between a full container and LCL, who does what from booking to the return of the empty box, and how alliances and routes stood at the end of 2026.
Pick a type of container or a way of shipping to see which cargo it is built for, how much it holds and what sets it apart.
Built for this cargo Can also carry it
Capacity 76.3 cubic metres, payload up to 28,650 kg
What sets it apart Internal height of 2.70 m instead of 2.39
Built for Light and bulky cargo, general cargo
Dimensions, volumes and payloads are those of one shipping line's specification and change with the series of the container: read them as an order of magnitude.
It is the carrier that operates the ships. It confirms the booking, provides the container and issues the master bill of lading.
It is a carrier that does not operate the vessels. Towards its customers it is the carrier and issues its own house bill of lading; towards the shipping line it is a shipper.
It arranges the movement of the cargo, books space with the carriers and handles the documents. FIATA describes its work as services of any kind relating to the carriage, consolidation, storage and handling of the goods.
It is the organisation that loads and unloads the goods to and from the ships. The containers pass through its gate on the way in and on the way out.
It is the professional authorised by the customs authority to assist importers and exporters with the customs formalities. It is often the forwarder itself.
A container shipment follows the same steps on every route. Each step has its own deadline, the cut-off, and missing one means sailing on the next ship. The definitions are those of the glossary of DCSA, the standards body of the shipping lines.
The carrier confirms the booking with the rate agreed, the space allocated, the transport plan and the instructions for collecting the empty container.
The empty container is collected and the cargo is loaded into it. In a full container load this is done by the shipper, in LCL by the carrier or its agent at the container freight station.
The shipper completes the booking with the data needed to create the bill of lading. They are due by the documentation cut-off, which can also cover the customs documents.
The shipper states the verified weight of the packed container by the VGM cut-off. There are two methods of obtaining it, and without it the container is not loaded.
The full container enters the terminal. The gate-in cut-off is the latest moment at which it can be delivered for that ship.
ETD and ETA are the estimated times of departure and arrival. On many routes the container changes ship on the way: transhipment is the transfer from one vessel to another.
At the port of arrival the container is lifted off the ship. The cargo release is the permission to leave the yard, and the delivery order is the document that orders the release to the party named.
Free time is the period without extra charges. Beyond it demurrage runs while the container is inside the terminal, detention while it is outside and not yet returned empty, and storage for the space occupied.
It is the shortest container. In the specification of one large shipping line it measures 5.90 metres long, 2.35 wide and 2.39 high inside, for 33.2 cubic metres. It weighs 2,300 kilos empty and carries up to 30,200, for a maximum gross mass of 32,500 kilos. For its volume it is the one that carries most weight, which is why dense cargo travels in it.
Worth knowing. On a single layer it takes 11 pallets of 1,200 by 800 millimetres or 10 of 1,200 by 1,000, according to a forwarder's loading guide. Older series have a gross mass of 30,480 kilos and a payload of 28,180. Another line gives 33.1 cubic metres: the figures change a little from one fleet to another.
Capacity 33.2 cubic metres, payload up to 30,200 kg
What sets it apart The shortest: 5.90 m of internal length
Built for Dense cargo and general cargo
It is twice as long as the 20 foot: 12.03 metres inside, with the same width of 2.35 and a height of 2.39, for 67.7 cubic metres. It weighs 3,700 kilos empty and carries up to 28,800 kilos. The volume doubles but the payload does not: it is slightly lower than that of the 20 foot, so less dense cargo travels in it.
Worth knowing. On a single layer it takes 24 pallets of 1,200 by 800 millimetres or 21 of 1,200 by 1,000, according to the same loading guide. Older series have a gross mass of 30,480 kilos and a payload of 26,700. The base freight is the price for moving the container from port to port: the space left empty is paid for all the same.
Capacity 67.7 cubic metres, payload up to 28,800 kg
What sets it apart Twice the length, not twice the payload
Built for General cargo of medium density
It has the same floor as the 40 foot but is taller: 2.70 metres inside instead of 2.39, for 76.3 cubic metres. It weighs 3,850 kilos empty and carries up to 28,650. The extra thirty centimetres or so give about 8.6 cubic metres more volume without changing the space the container takes up on the ground.
Worth knowing. The extra height serves light and bulky cargo, which fills the volume before it reaches the payload. Another line gives 76.2 cubic metres. The payload is a little lower than that of the standard 40 foot, because the container itself weighs 150 kilos more.
It is the largest dry container in the specification: 13.56 metres of internal length, 2.35 of width and 2.70 of height, for 86.0 cubic metres. It weighs 4,700 kilos empty and carries up to 27,800. Compared with the 40 foot high cube it adds about a metre and a half of length and almost ten cubic metres.
Worth knowing. It is also the one with the lowest payload of the four dry containers: the larger the container, the more it weighs empty and the less cargo it can carry within the same gross mass of 32,500 kilos. Another line gives the same volume of 86.0 cubic metres.
Capacity 86.0 cubic metres, payload up to 27,800 kg
What sets it apart The largest dry container: 13.56 m inside
Built for Light and very bulky cargo
It is the temperature controlled container. In the specification of the same line it keeps the cargo at a set temperature between 40 degrees below zero and 30 degrees above. The range covers frozen goods, fresh produce and goods that only need protecting from heat or frost during the weeks of the voyage.
Worth knowing. Volume and payload depend on the length and the series, as for dry containers, and are read in the carrier's specification. For perishable cargo the days at sea count too: at the end of 2025 the actual transit between the Far East and North Europe was about 40 days via Suez and about 52 via the Cape.
Capacity Depends on length and series
What sets it apart Temperature from 40 below zero to 30 above
Built for Perishable or temperature sensitive cargo
It is the container for cargo too tall for a closed container. In place of the rigid roof it has a tarpaulin, which is removed to load from above with a crane. It is used when the piece is tall, or when it is simpler to lower it from above than to bring it in through the doors.
Worth knowing. Volume and payload depend on the length and the series and are read in the carrier's specification. As for every container, the shipper states the verified gross mass before loading, and that statement is a condition for being loaded on the ship.
What sets it apart Tarpaulin in place of the roof, loaded by crane
Built for Cargo taller than a closed container
It is the container for heavy and oversize cargo. It has a floor and two end walls that can be folded down, so the load can go beyond the width and height of a closed container. It is used for pieces that by weight or size do not fit in any other type.
Worth knowing. It has no volume, because it is not a closed box: what counts is the payload and the size of the piece, read in the carrier's specification. In a full container shipment loading is the shipper's job, and here that includes fastening the piece to the floor.
Capacity No closed volume: the payload is what counts
What sets it apart End walls that fold down
Built for Heavy and oversize cargo
It is the container for liquids. In the specification of the same line the tanks form two separate fleets, one for foodstuffs and one for chemical products. Filling has two limits: at least 80 per cent of the capacity, and never 100 per cent.
Worth knowing. The lower and the upper limit apply together: the quantity shipped is therefore worked out from the capacity of the tank, not the other way round. Capacity and payload depend on the series and are read in the carrier's specification, as for the other containers.
Capacity Filled to at least 80 per cent, never to 100
What sets it apart Separate fleets for foodstuffs and chemicals
Built for Liquids
It is the way to ship when the goods do not fill a container. In a full container load (FCL) the shipper or the consignee loads and unloads the container; in LCL the carrier or its agent does, bringing together the lots of several customers in one container. The goods are delivered to a container freight station (CFS) and collected from one on arrival.
Worth knowing. The freight is not paid per container but on the weight or the measurement of the lot, whichever gives the higher amount. The bill of lading the customer receives is normally a house bill, issued by a transport intermediary, while the master bill is issued by the carrier for the whole container.
Capacity Freight on weight or measurement, whichever is greater
What sets it apart Consolidated at a container freight station
Built for Lots that do not fill a container
The same goods can travel in a container of their own or share one with other lots. The two ways differ in who handles the cargo, how the freight is calculated and which bill of lading the customer holds.
1 Who loads and unloads In FCL the shipper loads the container and the consignee unloads it. In LCL the carrier or its agent does both.
2 Where the goods are handed over An FCL container is delivered full to the terminal. LCL goods go to a container freight station, the facility where lots are consolidated at origin and deconsolidated at destination.
3 How the freight is calculated In FCL the base freight is the charge for moving the container from port to port, whatever it holds. In LCL it is charged on weight or measurement, whichever is greater.
4 What is added to the base freight A fuel surcharge that follows the price of bunker, terminal handling at origin and at destination, and a peak season surcharge when demand is high. An all-in price is the total including all the transport charges.
5 Which bill of lading The master bill of lading is created by the carrier. The house bill is created by a transport intermediary, such as an NVOCC, for its own customer.
6 Emissions Since January 2024 ships of 5,000 gross tonnes and above have been in the EU emissions trading system: all the emissions of voyages between Union ports and half of those to or from a port outside it. The lines pass the cost on in the freight.
The large lines share ships and services in alliances, so the name on the booking and the name on the ship are often different. Routes between the Far East and Europe were changing again at the end of 2026. Every figure carries its date.
Gemini Cooperation Maersk and Hapag-Lloyd, operating since February 2025.
Premier Alliance ONE, HMM and Yang Ming, since February 2025, agreed for five years.
Ocean Alliance CMA CGM, COSCO, OOCL and Evergreen, since 2017, extended to 2032.
MSC On its own since the 2M alliance ended in January 2025, with a slot exchange with the Premier Alliance on nine services between Asia and Europe.
Largest lines by capacity MSC about 22 per cent of world capacity, Maersk about 14, CMA CGM about 13, COSCO about 11 (Alphaliner figures as reported on 20 November 2026).
Suez or the Cape In November 2026 the return to the Suez route is partial and in progress: at the end of October about 63 per cent of Far East to Europe capacity was on services using Suez in at least one direction.
Days at sea from the Far East Actual days, Xeneta figures of December 2025: to North Europe 40 via Suez and 52 via the Cape; to the Mediterranean 34 via Suez and 49 via the Cape.
A few rules apply to every container, whatever it holds and whoever carries it.
1 The carrier's liability limit Under the Hague-Visby Rules the carrier answers for loss or damage up to 666.67 special drawing rights per package or 2 per kilo of gross weight, whichever is higher. A higher value counts only if it is declared in the bill of lading.
2 Packages inside the container When the bill of lading lists the packages packed in the container, those are the packages for the limit. When it does not, the container itself counts as one package.
3 Verified gross mass (VGM) Since 1 July 2016 the SOLAS Convention has made the shipper responsible for stating the verified weight of every packed container, obtained with one of two methods. It is a condition for loading.
4 Wood packaging Pallets, crates and dunnage made of wood fall under ISPM 15, the international standard that regulates wood packaging material in international trade.
5 Emission allowances The lines surrender allowances in steps: for 40 per cent of the emissions of 2024, for 70 per cent of those of 2025 and for all of them after that.
This page explains how container shipping works. Which container and which service fit your goods depends on the product, the route and the volumes: if you would like an opinion, write to me.
Sea freight is one piece of the purchase: the Incoterms rule says who books and pays for it, the landed cost guide adds it up with the other lines, the documents guide explains the bill of lading and the claims guide what happens when cargo is damaged.
Incoterms® 2020 ›Total cost of an import ›Shipping documents ›Cargo damage and claims ›
This page describes market practice and rules as they stand in November 2026 and is a summary for information only. The figures of containers come from carriers' specifications and vary by series, transit times and capacity shares are indicative and carry their date, and nothing here is legal advice. Sources: Hapag-Lloyd, Container specification; ONE, Dry containers; DCSA, Glossary; DCSA, Cut-off times in shipping; FMC, Ocean transportation intermediaries; FIATA, Freight forwarding; IMO, Verified gross mass; UK legislation, Hague-Visby Rules; European Commission, Shipping emissions; IPPC, ISPM standards. Updated in November 2026.
A guide to print: nine containers and ways of shipping side by side, the steps of a booking with their cut-offs, full container and LCL compared, alliances and routes in November 2026 and the rules that apply to every container. You get it by subscribing to my newsletter, which comes out twice a year with news on customs, transport and international purchasing.